martes, 16 de agosto de 2011

Day 6

On the sixth day of our trip, we woke up at 6.30. At 7 o´clock we had breakfast and at 8.30 we went to the “Tourists Centre” and watched a film. Then we went to the “Yacyretá Dam” with a tourist guide who explained to us everything about the dam.

Yacyreta Dam is a hydroelectric power plant built over the waterfalls of Yacyretá-Apipé in the Paraná between the Argentina province of Corrientes and the city of Ayolas in Paraguay. It is one of the biggest and most important works of engineering in  Latin America.

It is 80 km. downstream of the cities of Posadas (Argentina) and Encarnación (Paraguay). It has 20 turbines. Their main aims are to produce electricity and improve the navigation of the river. 

After that, we went to Ituzaingo coast and there we read a story and made a reflexion.  Then, we did some activities for our Biology project.

Then we had lunch. We ate some chicken and smashed potatoes in a restaurant.

In the afternoon we went to the famous church in Itati, and we had a farewell Mass. After the celebration we could buy some souveniers for our families and then we had tea.

Finally we travelled for some hours and stopped in Corrientes to have dinner and watch Unión football match. 

Then we went back to Santa Fe and arrived here at 6.30 am.



Yacyretá  Dam

Our Lady of Itatí Church
                Yacyretá Dam
                                          The guide at the Dam



Comunidad

Elena Asensio
Agueda Fontanellaz
 Joaquín Kohlbrener
Facundo Racca
 Abi Roldan
Luciano Tiracchia

No hay comentarios:

Publicar un comentario